Bahrain: The Ministry of works UPDA completed 56% of the main rainwater drainage line construction, which connect to housing projects in Al Aker area. Eng. Saleh Tradah mentioned that the project aims to mitigate rainwater accumulated in that area which is also a joint effort between the Ministry of Works and Capital to develop the infrastructure in the Capital Governorate and rehabilitate the most affected areas during the rainy season.
Trending
- VP Sara: Halos 200 personnel, posibleng mawalan ng trabaho sa tapyas sa 2025 budget
- Durian ng Pinas planong dalhin sa New Zealand
- PhilHealth inalis na ‘single confinement policy’
- Senator Imee kumalas sa admin senatorial ticket
- Alice Guo ‘spy’ ng China, iimbestigahan ng DILG-PNP
- 24 ex-PNP chiefs iniimbestigahan na – Marbil
- Ex-PNP chief ‘tumulong’ sa pagtakas ni Alice Guo
- P1.3 bilyong tinapyas ng Kamara sa pondo ni VP Sara