Bahrain: The Ministry of works UPDA completed 56% of the main rainwater drainage line construction, which connect to housing projects in Al Aker area. Eng. Saleh Tradah mentioned that the project aims to mitigate rainwater accumulated in that area which is also a joint effort between the Ministry of Works and Capital to develop the infrastructure in the Capital Governorate and rehabilitate the most affected areas during the rainy season.
Trending
- 24 ex-PNP chiefs iniimbestigahan na – Marbil
- Ex-PNP chief ‘tumulong’ sa pagtakas ni Alice Guo
- P1.3 bilyong tinapyas ng Kamara sa pondo ni VP Sara
- China nagdeploy ng 203 barko sa West Philippine Sea
- Quiboloy sumuko ka na! — Abalos
- Duterte-Duterte sa 2028 itinutulak
- Barko pa ng Pinas, binangga ng CCG!
- Pangandaman inaprub P3.681 bilyong free Wi-Fi program