Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Internet voting pinatitigil sa SC

    April 4, 2025

    3 Pinoy ‘spy’ inaresto sa China

    April 4, 2025

    Pangulong Marcos, VP Sara trust ratings bumaba – SWS

    February 5, 2025
    Facebook Twitter Instagram
    Trending
    • Internet voting pinatitigil sa SC
    • 3 Pinoy ‘spy’ inaresto sa China
    • Pangulong Marcos, VP Sara trust ratings bumaba – SWS
    • Mercado bagong PhilHealth Presidente.; Nerez itinalagang PDEA chief
    • VP Sara: Halos 200 personnel, posibleng mawalan ng trabaho sa tapyas sa 2025 budget
    • Durian ng Pinas planong dalhin sa New Zealand
    • PhilHealth inalis na ‘single confinement policy’
    • Senator Imee kumalas sa admin senatorial ticket
    Facebook Twitter Instagram YouTube
    Starvision NewsStarvision News
    Subscribe
    Saturday, May 10
    • HOME
    • WORLD
    • PHILIPPINES
    • BAHRAIN
    • GULF
    • Entertainment
    Starvision NewsStarvision News
    Home»NEWS»London’s Tower Bridge stuck open due to a technical fault
    NEWS

    London’s Tower Bridge stuck open due to a technical fault

    News DeskBy News DeskAugust 9, 2021No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    London : London’s Tower Bridge was stuck with its roadway arms raised Monday afternoon, snarling traffic on both sides of the River Thames, reports AP.

    Images of the 127-year-old drawbridge, one of several spans that connect the northern and southern parts of the British capital, show the two halves of the roadway pointing skyward with vehicles backed up on either side.

    The bridge remained stuck at 6 p.m., (1700 GMT/1300 EDT) more than three hours after the problems began.

    “Due to a technical issue, Tower Bridge is currently stuck in a raised position,” the City of London Corp., which owns the bridge, said in a statement. “We are working to resolve the issue as quickly as possible.”

    The bridge opens about 800 times a year to allow large ships to pass, with the times arranged at least 24 hours in advance.

    Tower Bridge was repaired in 2006 after the mechanism became stuck four times the previous year. Malfunctions have been less frequent since then, with the last incident reported on Aug. 22, 2020, when it was stuck for more than an hour.

    In May of 1997, U.S. President Bill Clinton was separated from Prime Minister Tony Blair when the bridge opened before his motorcade could cross. In that case there was no technical fault. Just bad timing.

    bridge London Lpndon technical fault tower
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    News Desk

    Related Posts

    3 Pinoy ‘spy’ inaresto sa China

    April 4, 2025

    7 Pinoy nahuli sa cyber scam sa Laos, nakauwi na

    August 24, 2024

    China, ginagalit ang mga Pinoy – Philippine Navy

    June 20, 2024
    Add A Comment

    Comments are closed.

    Editors Picks
    8.5

    Apple Planning Big Mac Redesign and Half-Sized Old Mac

    January 5, 2021

    Autonomous Driving Startup Attracts Chinese Investor

    January 5, 2021

    Onboard Cameras Allow Disabled Quadcopters to Fly

    January 5, 2021
    Top Reviews
    9.1

    Review: T-Mobile Winning 5G Race Around the World

    By cinideep
    8.9

    Samsung Galaxy S21 Ultra Review: the New King of Android Phones

    By cinideep
    8.9

    Xiaomi Mi 10: New Variant with Snapdragon 870 Review

    By cinideep
    Advertisement
    Star Vision
    Starvision News
    Facebook Instagram YouTube Twitter
    • Home
    © 2025 Star Vision. Designed by Star Vision Global.

    Type above and press Enter to search. Press Esc to cancel.