Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Internet voting pinatitigil sa SC

    April 4, 2025

    3 Pinoy ‘spy’ inaresto sa China

    April 4, 2025

    Pangulong Marcos, VP Sara trust ratings bumaba – SWS

    February 5, 2025
    Facebook Twitter Instagram
    Trending
    • Internet voting pinatitigil sa SC
    • 3 Pinoy ‘spy’ inaresto sa China
    • Pangulong Marcos, VP Sara trust ratings bumaba – SWS
    • Mercado bagong PhilHealth Presidente.; Nerez itinalagang PDEA chief
    • VP Sara: Halos 200 personnel, posibleng mawalan ng trabaho sa tapyas sa 2025 budget
    • Durian ng Pinas planong dalhin sa New Zealand
    • PhilHealth inalis na ‘single confinement policy’
    • Senator Imee kumalas sa admin senatorial ticket
    Facebook Twitter Instagram YouTube
    Starvision NewsStarvision News
    Subscribe
    Friday, June 6
    • HOME
    • WORLD
    • PHILIPPINES
    • BAHRAIN
    • GULF
    • Entertainment
    Starvision NewsStarvision News
    Home»GULF»NAWAH starts nuclear refuelling phase, maintenance on Unit 1 of Barakah Nuclear Power Plant
    GULF

    NAWAH starts nuclear refuelling phase, maintenance on Unit 1 of Barakah Nuclear Power Plant

    News DeskBy News DeskApril 18, 2022No Comments1 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The Federal Authority for Nuclear Regulation (FANR) has confirmed that Nawah Energy Company (Nawah) has started the regular nuclear refuelling phase and maintenance of Unit 1 of Barakah Nuclear Power plant.

    During this phase, new nuclear fuel assemblies will be added and a number of maintenance and testing activities will be carried out for equipment used for power production, safety-related systems and others.

    In a statement, FANR said it is currently conducting its regulatory oversight activities including review and inspection programmes at Barakah Nuclear Power Plant Unit 1 refuelling and maintenance phase to ensure all activities associated are as required by FANR’s regulations.

    Following the completion of the refuelling phase, the unit 1 will return to power operations after obtaining the approval from FANR, the statement said.

    UAE
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    News Desk

    Related Posts

    7 Pinoy nahuli sa cyber scam sa Laos, nakauwi na

    August 24, 2024

    Pinas dapat maghanda vs external threat — Pangulong Marcos

    June 12, 2024

    Mag-asawang Fil-Am patay sa car crash, ikinaulila ng 6 nilang anak

    January 12, 2024
    Add A Comment

    Comments are closed.

    Editors Picks
    8.5

    Apple Planning Big Mac Redesign and Half-Sized Old Mac

    January 5, 2021

    Autonomous Driving Startup Attracts Chinese Investor

    January 5, 2021

    Onboard Cameras Allow Disabled Quadcopters to Fly

    January 5, 2021
    Top Reviews
    9.1

    Review: T-Mobile Winning 5G Race Around the World

    By cinideep
    8.9

    Samsung Galaxy S21 Ultra Review: the New King of Android Phones

    By cinideep
    8.9

    Xiaomi Mi 10: New Variant with Snapdragon 870 Review

    By cinideep
    Advertisement
    Star Vision
    Starvision News
    Facebook Instagram YouTube Twitter
    • Home
    © 2025 Star Vision. Designed by Star Vision Global.

    Type above and press Enter to search. Press Esc to cancel.